Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (10025 in total) :  <<   273   274   275   276   277  [ 278 ]  279   280   281   282   283   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
edtherendermanCleveland Westland WhirlwindBuild30-Mar-22 11:20
Views : 615
Gear doors closed. Doors where created using the piece cut out of the nacelle as a buck, then vacuum formed styrene over the buck. The styrene was supper thin and flexible, so I built up the insides with many layers of tissue and EZ-Dope. The outsides where filled with spackling compound, sounded, tissued, doped and painted with sanding primer. I still need to add small magnets to keep the doors together when closed.
edtherendermanCleveland Westland WhirlwindBuild30-Mar-22 11:19
Views : 588
Inside of nacelle looking down. You can see the hinges for the gear doors. The tee pins will be replaced with hinge pins before installing the nacelle on the wing.
Hangar Aircraft Category Date Preview
edtherendermanCleveland Westland WhirlwindBuild30-Mar-22 11:18
Views : 610
Did not estimate that it would take over a month of weekends and evenings to get the landing gear sorted, but here it is. Starboard landing gear down.
David DuckettTodays Hobbies F4-E Phantom IIBuild26-Mar-22 21:22
Views : 8443
Page (10025 in total) :  <<   273   274   275   276   277  [ 278 ]  279   280   281   282   283   >>  [ < Prev ] [ Next > ]