Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (39 in total) :  <<   11   12   13   14   15   16   17   18   19   20   21   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
David DuckettGuillows Series 2000 - B-29 Super FortressBuild21-Mar-13 21:30
Views : 1029
The landing gear doors were cut from the bottom engine nacelle before it was assembled. To reattach I "hung" them with a short piece of masking tape taped to the backside of the door and that allows enough support so the door can then be braced a bit with a finger inside the nacelle while a small amount of CA is applied to the junction. As soon as it cures enough to hold by itself a short piece of styrene rod was laid on the junction. The CA is still wet enough to hold the rod in place but I gave it an overall application just to make sure. You can see how it blends in. I've used this method before and I would prefer to hide the rod but this time I couldn't.
David DuckettGuillows Series 2000 - B-29 Super FortressBuild21-Mar-13 10:16
Views : 950
Styrene rod glued to junction of landing gear door and engine nacelle
David DuckettGuillows Series 2000 - B-29 Super FortressBuild21-Mar-13 10:12
Views : 942
David DuckettGuillows Series 2000 - B-29 Super FortressBuild20-Mar-13 07:07
Views : 929
http://www.vintagewings.ca/VintageNews/Stories/tabid/116/articleType/ArticleView/articleId/35/language/en-CA/The-Untold-Story-of-Patriot-Jesse-O-Williams.aspx
David DuckettGuillows Series 2000 - B-29 Super FortressBuild16-Mar-13 07:38
Views : 1034
Props are assembled and painted and the painting of the "greenhouse" is finished.
David DuckettGuillows Series 2000 - B-29 Super FortressBuild16-Mar-13 07:36
Views : 927
The section below the windows was covered with silkspan and given a couple of coats of clear dope. I used Pactra masking tape for all but the very front of the canopy and the entire process was spread over 4 days. Here light green is applied first and will be followed by three coats of gray and then two coats of thye gray with iridescent silver added.
Hangar Aircraft Category Date Preview
David DuckettGuillows Series 2000 - B-29 Super FortressBuild14-Mar-13 21:20
Views : 893
David DuckettGuillows Series 2000 - B-29 Super FortressBuild14-Mar-13 06:59
Views : 995
The cast resin prop blades were sprayed with Model Masters gloss black enamel and still need to be cut to length. The painting of the canopy is nearly finished. The paper Night Prowler will be replaced with a decal of it. 85* yesterday!
RTD89Guillows Series 2000 - B-29 Super FortressBuild13-Mar-13 22:26
Views : 882
David DuckettGuillows Series 2000 - B-29 Super FortressFlying12-Mar-13 04:40
Views : 988
Fifi in Phoenix 2-28-13
David DuckettGuillows Series 2000 - B-29 Super FortressBuild11-Mar-13 21:20
Views : 876
David DuckettGuillows Series 2000 - B-29 Super FortressBuild11-Mar-13 21:19
Views : 890
Page (39 in total) :  <<   11   12   13   14   15   16   17   18   19   20   21   >>  [ < Prev ] [ Next > ]