Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (13 in total) :  1   2  [ 3 ]  4   5   6   7   8   9   10   11   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustAerodromeRC PT Crop DusterBuild22-Jul-09 18:50
Views : 957
Some where in the hand crafted cherry and beech laminated blake, a duster prop resides. Now to try to set it free!
John M OshustAerodromeRC PT Crop DusterBuild22-Jul-09 18:49
Views : 1032
Partially free!
John M OshustAerodromeRC PT Crop DusterBuild17-Jul-09 16:40
Views : 1015
Right rigging completed.
John M OshustAerodromeRC PT Crop DusterBuild17-Jul-09 16:39
Views : 939
Left rigging complelted.
John M OshustAerodromeRC PT Crop DusterBuild17-Jul-09 16:38
Views : 1031
Wing mounted guages.
John M OshustAerodromeRC PT Crop DusterBuild15-Jul-09 08:16
Views : 1051
Magic box prop for a look see.
Hangar Aircraft Category Date Preview
John M OshustAerodromeRC PT Crop DusterBuild15-Jul-09 08:15
Views : 980
The rear wing rigging next
John M OshustAerodromeRC PT Crop DusterBuild15-Jul-09 08:14
Views : 1041
Rigging 2/3 complete
John M OshustAerodromeRC PT Crop DusterBuild12-Jul-09 16:26
Views : 1008
John M OshustAerodromeRC PT Crop DusterBuild12-Jul-09 16:25
Views : 961
1/3 of wing rigging completed. Music wire rigging snaps into place with Al tubing ferrules at each end of rigging wire. The ferrules mout on wire puns attached to the wing. This plane can be taken apart for ease of transport to the mini museum, then permanently assembled.
John M OshustAerodromeRC PT Crop DusterBuild10-Jul-09 17:41
Views : 1058
Ailerons completed.
John M OshustAerodromeRC PT Crop DusterBuild10-Jul-09 17:40
Views : 1004
Now on to the rigging.
Page (13 in total) :  1   2  [ 3 ]  4   5   6   7   8   9   10   11   >>  [ < Prev ] [ Next > ]