Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (365 in total) :  <<   21   22   23   24   25  [ 26 ]  27   28   29   30   31   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild25-Feb-15 18:06
Views : 607
Attention was paid to alignment of the airfoils.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild25-Feb-15 18:05
Views : 631
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked25-Feb-15 18:04
Views : 583
The BE 12a has visible pulleys that guide the aileron control cables, with their directional force, over the top surface of the upper wing and lower surface of the lower wing. In order for the ailerons to function the fabrication of 8 small pulleys is required. Here is the prototype that Gumby fabricated. Seven more pulleys are required.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Feb-15 17:09
Views : 581
There are some who missed seeing Gumby in yesterday’s posting. I was sure to include him in today’s activities. Gumby started his day with some engine maintenance.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Feb-15 17:08
Views : 597
Then with the aid of our test pilot “Slim”, they tried starting the engine.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked24-Feb-15 17:08
Views : 578
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Feb-15 17:06
Views : 575
We did get the lower foils and ailerons sealed with polycrylic.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Feb-15 17:05
Views : 528
The lower wings were then covered with polys-pan.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild23-Feb-15 17:12
Views : 642
The “Twins” should mount up nicely when their mount is fully fabricated.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild23-Feb-15 17:11
Views : 643
Don C.... please note the carbon rods in the upper wing center section.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild23-Feb-15 17:10
Views : 572
The finishing of the lower air foils proceeds.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild22-Feb-15 15:27
Views : 569
An excuse to use his ladder Gumby takes some measurements.
Page (365 in total) :  <<   21   22   23   24   25  [ 26 ]  27   28   29   30   31   >>  [ < Prev ] [ Next > ]