Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3344 in total) :  <<   2725   2726   2727   2728   2729   2730   2731   2732   2733   2734   2735   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
simpleflyerGuillows 1903 Wright FlyerBuild20-Apr-08 19:31
Views : 2078
Top wing LE rounded off and half of the ribs glued in. Only cracked 2 and broke one so far.
Abby MarieGuillows Series 2000 - B17 Flying FortressParked20-Apr-08 19:00
Views : 7852
B-17 at Laconia airport last Oct.
Abby MarieGuillows Series 2000 - B17 Flying FortressParked20-Apr-08 18:53
Views : 7577
B-25 at Laconia, NH airport last oct. Anyone for chin art?
David DuckettGuillows Series 1200 - Space ShuttleAerial20-Apr-08 15:49
Views : 1307
"Ola, Houston!" "Hay problema!!"
David DuckettGuillows Series 1200 - Space ShuttleBuild20-Apr-08 15:47
Views : 1164
"Yes, it really is that important."
David DuckettGuillows Series 1200 - Space ShuttleParked20-Apr-08 15:46
Views : 1181
Hangar Aircraft Category Date Preview
David DuckettGuillows Series 1200 - Space ShuttleBuild20-Apr-08 15:43
Views : 1106
Alright, back to serious modeling. I've made the front section of the wing from wood instead of using the supplied plastic pieces. The elevons are tack glued on for sanding and shaping.
poppyScratch Built North American P-51BBuild20-Apr-08 06:25
Views : 1323
And Trailing edges sanded. Now for some cockpit details, wing installation and radiator scoop carving.
poppyScratch Built North American P-51BBuild20-Apr-08 06:23
Views : 1242
Leading edges shaped.
poppyScratch Built North American P-51BBuild20-Apr-08 06:22
Views : 1281
Wing tip blocks installed and shaped.
poppyScratch Built North American P-51BBuild20-Apr-08 06:21
Views : 1261
Some additional carving was necessary for cockpit.
simpleflyerGuillows 1903 Wright FlyerBuild19-Apr-08 22:27
Views : 2009
Construction of the Wright Flyer begins. Wing spars spliced and glued.
Page (3344 in total) :  <<   2725   2726   2727   2728   2729   2730   2731   2732   2733   2734   2735   >>  [ < Prev ] [ Next > ]