Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3344 in total) :  <<   2768   2769   2770   2771   2772   2773   2774   2775   2776   2777   2778   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 19:25
Views : 1404
The interior of the doors were lined in padded leather, so was the large head rest, as was the front of the pit over the inst. panel. Gumby will never be a Boris, but he is all that I have now!
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 19:22
Views : 1407
Gumby got a coay of paint on the wind screen frame, finishe the scoops over the instrument panel, and finished the doors. Priming wings tomorrow.
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 19:19
Views : 1325
The polymorphous mass of clay is through for the day. Two doors paded, painted and lined.
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 16:01
Views : 1284
The door open....now to make the other side!
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 16:00
Views : 1282
The door closed.
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 15:59
Views : 1304
Note the pilot waiting in the WINGS!
Hangar Aircraft Category Date Preview
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 14:57
Views : 1263
The upper walls of the pit have been cut to accept the doors that are under construction. Part of the first hinge can be seen.
snapasneyGuillows Series 500 - P-40 WarhawkBuild24-Mar-08 12:59
Views : 3935
I finally started her today. I apologize for the image quality, I omly have a webcam.
David DuckettBerkeley North American AJ-2 SavageParked24-Mar-08 08:28
Views : 20098
I'm adding this pic to be the default image for my hanger.
SteveMMolt Models TyroBuild24-Mar-08 03:18
Views : 1276
The fuselage frame is complete for now, on to the wing. Small hatch is held on by magnets.
jerry campbellDumas Kit #404, Supermarine S.6BBuild23-Mar-08 20:54
Views : 1283
The two floats are nearing completion. The one in the back still has some additionl stringers to be added. the one in the foreground has all stringers and has been sanded but must have it's first coat of dope. The rear balsa blocks have been added but not
poppyGuillows Series 400 - BF 109Build23-Mar-08 20:37
Views : 1653
Some minor touch up to do.
Page (3344 in total) :  <<   2768   2769   2770   2771   2772   2773   2774   2775   2776   2777   2778   >>  [ < Prev ] [ Next > ]