| Hangar |
Aircraft |
Category |
Date |
Preview |
| poppy | Eureka Boeing B-29 | Build | 24-Jul-09 12:23 |  | | Views : 1065 | | Bottom edges bevelled into shaped block, filled and sanded. |
| poppy | Eureka Boeing B-29 | Build | 24-Jul-09 12:22 |  | | Views : 1064 | | Rear block for outside nacelle will be carved when wing covering installed. Outer nacelle req'd 12 pieces 1/16" balsa, inner one 18 pcs. |
| poppy | Eureka Boeing B-29 | Build | 24-Jul-09 12:20 |  | | Views : 1071 | | 2 nacelles finished. |
| poppy | Eureka Boeing B-29 | Build | 11-Jul-09 16:00 |  | | Views : 1079 | | Nacelle blocks in place, L/G sitting in place. This is going to be like building 4 small fuselages. I think in the fifties the words "easy build" were not as important as they would be today. |
| poppy | Eureka Boeing B-29 | Build | 29-Jun-09 19:40 |  | | Views : 1234 | |
| poppy | Eureka Boeing B-29 | Build | 29-Jun-09 19:39 |  | | Views : 1027 | | Have to return to lake this week so I thought I would post the full span pics. |
|
| Hangar |
Aircraft |
Category |
Date |
Preview |
| poppy | Eureka Boeing B-29 | Build | 25-Jun-09 18:47 |  | | Views : 915 | | Full span-right wing. |
| poppy | Eureka Boeing B-29 | Build | 23-Jun-09 18:12 |  | | Views : 1000 | | Another 37" will be added to complete full wingspan. |
| poppy | Eureka Boeing B-29 | Build | 23-Jun-09 18:11 |  | | Views : 994 | | Test fit of wing sections. |
| poppy | Eureka Boeing B-29 | Build | 21-Jun-09 18:20 |  | | Views : 958 | | 3/16" spars added mainly to keep balsa skins from sagging. Inner wings are 20 1/2" inside to outside ribs. Outer wing panel will be 18 1/2" and is removable. |
| poppy | Eureka Boeing B-29 | Build | 21-Jun-09 18:17 |  | | Views : 927 | | Nacelles frames finished and attached to wing. |
| poppy | Eureka Boeing B-29 | Build | 21-Jun-09 18:16 |  | | Views : 914 | | Port inner wing frame done. Test fit of engine nacelles. |
|