| Hangar |
Aircraft |
Category |
Date |
Preview |
| rayl | Scratch Built Loening OL-8 Amphibian | Build | 12-May-16 11:27 |  |
| Views : 1050 |
| Tedious but once I got the system figured out, it didn't take all that long. |
| rayl | Scratch Built Loening OL-8 Amphibian | Build | 12-May-16 11:25 |  |
| Views : 942 |
| Well, after about 9600 "stiches" and over 200 surface tapes, (but who's counting), I believe that I can move on. |
| rayl | Scratch Built Loening OL-8 Amphibian | Build | 26-Apr-16 16:56 |  |
| Views : 991 |
| Another day or so to get the cabane struts placed and aligned. |
| rayl | Scratch Built Loening OL-8 Amphibian | Build | 26-Apr-16 16:55 |  |
| Views : 1030 |
| Biplane Guy, I 've been down the slope for decades (Used to be a plastic modeler). Example here ( a week of my life that I'll never get back) is of the rigging clevises for my Loening. Each clevis took 9 separate operations and three jigs to make. But it's FUN!!! |
| rayl | Scratch Built Loening OL-8 Amphibian | Build | 06-Apr-16 22:10 |  |
| Views : 1034 |
| Boy, I am glad that the wings don't have any rivets! Used up 1 1/2 sheets of the Micromark rivets to get to this point. I thnik that it will take about another 30 inches of rivets to finish up. |
| rayl | Scratch Built Loening OL-8 Amphibian | Build | 03-Apr-16 11:32 |  |
| Views : 1051 |
| I have been riveted to the main float today. |