| Hangar |
Aircraft |
Category |
Date |
Preview |
| Don C | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Parked | 06-Feb-15 00:33 |  | | Views : 691 | |
| Don C | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 06-Feb-15 00:32 |  | | Views : 704 | | R2800's ported and piped. |
| Don C | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 02-Feb-15 22:24 |  | | Views : 744 | |
| Don C | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 02-Feb-15 22:23 |  | | Views : 707 | |
| Don C | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 02-Feb-15 22:21 |  | | Views : 734 | | David, I think I figured out the gear doors - infilled completelyand covered, etc. then cut out the "closed" doors, put in a "floor" for later gear mounting and then split the doors. Got the correct shape. |
| Don C | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 02-Feb-15 22:12 |  | | Views : 721 | | I made wing fillets. Caught the last 5 minutes when I was called in for supper. Both worked out. |
|
| Hangar |
Aircraft |
Category |
Date |
Preview |
| Don C | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 02-Feb-15 22:08 |  | | Views : 757 | | Some watched football |
| Don C | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 30-Jan-15 14:34 |  | | Views : 783 | | Took about an hour of measuring and shimming to get the center wing section squared away. It's now 1330 and nothing has changed outside. Looks like a forest of flocked Christmas trees. |
| Don C | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 30-Jan-15 14:23 |  | | Views : 1145 | | Had to see |
| Don C | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 30-Jan-15 14:17 |  | | Views : 715 | | Need to figure out gear doors before mounting to wing. |
| Don C | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 30-Jan-15 14:11 |  | | Views : 754 | | Needs more engine details |
| Don C | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 30-Jan-15 14:07 |  | | Views : 777 | | 2 nacelles almost done |
|