| Hangar |
Aircraft |
Category |
Date |
Preview |
| David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Parked | 08-Nov-21 14:46 |  | | Views : 2113 | |
| David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Parked | 08-Nov-21 14:45 |  | | Views : 2233 | | Finished |
| David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-Oct-21 18:38 |  | | Views : 2142 | | One more light application of spackling will be added and then sanded smooth which will make it all ready to dope. |
| David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-Oct-21 18:35 |  | | Views : 2133 | | adfter drying overnight, sand with 220 wet/dry sandpaper. Two applications are needed for such shapes. |
| David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-Oct-21 18:33 |  | | Views : 2089 | | The space between the fuselage and wing were filled with scraps and the pattern taped. |
| David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-Oct-21 18:32 |  | | Views : 2034 | | Wing infill is 1/16' stock bottom, 3/32" top |
|
|