Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3 in total) :  <<  [ < Prev ]
Hangar Aircraft Category Date Preview
hjlittmanScratch Built Gloster E28/39Parked05-Mar-26 22:06
Views : 2065
It has been flown.
hjlittmanScratch Built Gloster E28/39Build05-Mar-26 22:05
Views : 2163
On the balance rig, no ballast!
hjlittmanScratch Built Gloster E28/39Build05-Mar-26 22:04
Views : 2138
Inside of planked up cowl.
hjlittmanScratch Built Gloster E28/39Build22-Feb-26 21:10
Views : 2330
Almost there.
hjlittmanScratch Built Gloster E28/39Build15-Feb-26 23:35
Views : 2431
Im estimating 19 grams all up less rubber when finished.
hjlittmanScratch Built Gloster E28/39Build14-Feb-26 00:37
Views : 3401
The cowl frame was assembled with Scotch Tacky Glue to give working time and when dry simply lifted off the fixture.
Hangar Aircraft Category Date Preview
hjlittmanScratch Built Gloster E28/39Build14-Feb-26 00:35
Views : 2531
The built up cowl frame is assembled over a small fixture to keep it straight.
hjlittmanScratch Built Gloster E28/39Build14-Feb-26 00:32
Views : 2602
With the fuselage half covered you have a better idea of the colors.
hjlittmanScratch Built Gloster E28/39Build11-Feb-26 00:17
Views : 2636
Progress is being made
hjlittmanScratch Built Gloster E28/39Build10-Feb-26 00:54
Views : 2645
I had to build a little fixture to hold the cowl cone rings in alignment while I stacked them up.
hjlittmanScratch Built Gloster E28/39Build28-Jan-26 00:16
Views : 2596
The obligatory bones shot.
hjlittmanScratch Built Gloster E28/39Build25-Jan-26 00:47
Views : 2675
After I get the middle stringers on the other side, again slipping the wing in place to keep the stub spars aligned, I will put on the rest of the stringers and get to work on the cowl and nose block.
Page (3 in total) :  <<  [ < Prev ]