I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (72 in total) :  <<   8   9   10   11   12  [ 13 ]  14   15   16   17   18   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
David DuckettGuillows Series 2000 - B-29 Super FortressBuild21-Mar-13 21:32
Views : 809
My helper holds the wing down while the CA sets up.....
David DuckettGuillows Series 2000 - B-29 Super FortressBuild21-Mar-13 21:30
Views : 813
The landing gear doors were cut from the bottom engine nacelle before it was assembled. To reattach I "hung" them with a short piece of masking tape taped to the backside of the door and that allows enough support so the door can then be braced a bit with a finger inside the nacelle while a small amount of CA is applied to the junction. As soon as it cures enough to hold by itself a short piece of styrene rod was laid on the junction. The CA is still wet enough to hold the rod in place but I gave it an overall application just to make sure. You can see how it blends in. I've used this method before and I would prefer to hide the rod but this time I couldn't.
Hangar Aircraft Category Date Preview
David DuckettGuillows Series 2000 - B-29 Super FortressBuild21-Mar-13 10:16
Views : 733
Styrene rod glued to junction of landing gear door and engine nacelle
David DuckettGuillows Series 2000 - B-29 Super FortressBuild21-Mar-13 10:12
Views : 705
Page (72 in total) :  <<   8   9   10   11   12  [ 13 ]  14   15   16   17   18   >>  [ < Prev ] [ Next > ]