Hangar |
Aircraft |
Category |
Date |
Preview |
poppy | Eureka Boeing B-29 | Build | 29-Jun-09 19:40 | | Views : 968 | |
poppy | Eureka Boeing B-29 | Build | 29-Jun-09 19:39 | | Views : 755 | Have to return to lake this week so I thought I would post the full span pics. |
poppy | Eureka Boeing B-29 | Build | 25-Jun-09 18:47 | | Views : 656 | Full span-right wing. |
poppy | Eureka Boeing B-29 | Build | 23-Jun-09 18:12 | | Views : 742 | Another 37" will be added to complete full wingspan. |
poppy | Eureka Boeing B-29 | Build | 23-Jun-09 18:11 | | Views : 712 | Test fit of wing sections. |
poppy | Eureka Boeing B-29 | Build | 21-Jun-09 18:20 | | Views : 686 | 3/16" spars added mainly to keep balsa skins from sagging. Inner wings are 20 1/2" inside to outside ribs. Outer wing panel will be 18 1/2" and is removable. |
|
Hangar |
Aircraft |
Category |
Date |
Preview |
poppy | Eureka Boeing B-29 | Build | 21-Jun-09 18:17 | | Views : 680 | Nacelles frames finished and attached to wing. |
poppy | Eureka Boeing B-29 | Build | 21-Jun-09 18:16 | | Views : 658 | Port inner wing frame done. Test fit of engine nacelles. |
poppy | Eureka Boeing B-29 | Build | 18-Jun-09 15:40 | | Views : 827 | For scale. The handsome guy is 5'9"". |
poppy | Eureka Boeing B-29 | Build | 16-Jun-09 11:26 | | Views : 716 | 1/4" basswood splice joiner. 1/4"X1/4" basswood braces added. They aren't pretty but they do the job. |
poppy | Eureka Boeing B-29 | Build | 16-Jun-09 11:24 | | Views : 699 | Both halves joined and glued in place. |
poppy | Eureka Boeing B-29 | Build | 16-Jun-09 11:24 | | Views : 695 | Rear fuselage fully skinned. Open area is for stab. installation. Stabs span 27". |
|