Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3328 in total) :  <<   2688   2689   2690   2691   2692  [ 2693 ]  2694   2695   2696   2697   2698   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustTop Flite F4U CorsairBuild03-May-08 20:44
Views : 895
Misty, the evil one, awaits my departure for the day so he can attack his enemy again!
John M OshustTop Flite F4U CorsairBuild03-May-08 20:42
Views : 887
The plan...totally comlete the fuse. Paint, feathers, detailing, etc. Then constuct the 5 ft. wing. The wing MUST be removable for transport. Please note the high tech fuse support stand.
John M OshustTop Flite F4U CorsairBuild03-May-08 20:39
Views : 917
With most of the pit fabricated, my attention turns to the lower fuse. Note the EVIL one in the background. He tossed the fuse on the floor last night, and scattered about the fuse components. Cat reprimanded but still lives!
Brian KosteckiGuillows Series 800 - B-25 MitchellBuild03-May-08 15:22
Views : 3605
Brian KosteckiGuillows Series 800 - B-25 MitchellBuild03-May-08 15:20
Views : 3377
My kids are much more artistic than I am. I've got a lot to learn about painting, but I'm ready for the challenge.
Brian KosteckiGuillows Series 800 - B-25 MitchellBuild03-May-08 15:18
Views : 3473
Hangar Aircraft Category Date Preview
Brian KosteckiGuillows Series 800 - B-25 MitchellBuild03-May-08 15:15
Views : 3467
Primed and ready for paint.
David DuckettGuillows Series 1200 - Space ShuttleBuild03-May-08 12:32
Views : 2858
The cargo bay doors are firmly CA'd in place and the scope pallet is installed.
David DuckettGuillows Series 1200 - Space ShuttleBuild03-May-08 12:29
Views : 2537
The pallet with three scopes and antenna is now ready to be installed.
David DuckettGuillows Series 1200 - Space ShuttleBuild03-May-08 12:27
Views : 2497
My version of scratching...this end of a marker will be the main scope.
David DuckettGuillows Series 1200 - Space ShuttleBuild03-May-08 12:25
Views : 2631
I've CA'd on a 3/32" sq stringer to CA the open cargo bay doors to. The plastic doors have the cardstock CA's to them, and they are CA'd on to the main structure in small sections at a time.
David DuckettGuillows Series 1200 - Space ShuttleBuild03-May-08 12:17
Views : 966
Fitting the plastic piece which is the cargo doors
Page (3328 in total) :  <<   2688   2689   2690   2691   2692  [ 2693 ]  2694   2695   2696   2697   2698   >>  [ < Prev ] [ Next > ]