Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3327 in total) :  <<   2751   2752   2753   2754   2755  [ 2756 ]  2757   2758   2759   2760   2761   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
SteveMGuillows Series 900 - Cessna Bird DogBuild25-Mar-08 12:41
Views : 2734
Covered with tissue and am working on the canopy pieces. Forgot to use black tissue so I have to paint the nose, but it should be fine. Esitmated AUW is 20 grams plus the weight of crystal clear and decals.
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 19:25
Views : 1050
The interior of the doors were lined in padded leather, so was the large head rest, as was the front of the pit over the inst. panel. Gumby will never be a Boris, but he is all that I have now!
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 19:22
Views : 1014
Gumby got a coay of paint on the wind screen frame, finishe the scoops over the instrument panel, and finished the doors. Priming wings tomorrow.
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 19:19
Views : 949
The polymorphous mass of clay is through for the day. Two doors paded, painted and lined.
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 16:01
Views : 900
The door open....now to make the other side!
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 16:00
Views : 910
The door closed.
Hangar Aircraft Category Date Preview
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 15:59
Views : 911
Note the pilot waiting in the WINGS!
John M OshustScratch Built Polikarpov I-16 RataBuild24-Mar-08 14:57
Views : 885
The upper walls of the pit have been cut to accept the doors that are under construction. Part of the first hinge can be seen.
snapasneyGuillows Series 500 - P-40 WarhawkBuild24-Mar-08 12:59
Views : 2096
I finally started her today. I apologize for the image quality, I omly have a webcam.
David DuckettBerkeley North American AJ-2 SavageParked24-Mar-08 08:28
Views : 3421
I'm adding this pic to be the default image for my hanger.
SteveMMolt Models TyroBuild24-Mar-08 03:18
Views : 862
The fuselage frame is complete for now, on to the wing. Small hatch is held on by magnets.
jerry campbellDumas Kit #404, Supermarine S.6BBuild23-Mar-08 20:54
Views : 916
The two floats are nearing completion. The one in the back still has some additionl stringers to be added. the one in the foreground has all stringers and has been sanded but must have it's first coat of dope. The rear balsa blocks have been added but not
Page (3327 in total) :  <<   2751   2752   2753   2754   2755  [ 2756 ]  2757   2758   2759   2760   2761   >>  [ < Prev ] [ Next > ]