Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3327 in total) :  <<   76   77   78   79   80  [ 81 ]  82   83   84   85   86   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
bsadonkillGuillows Series 400 - BF 109Build14-Mar-22 08:25
Views : 648
TJHGuillows Series 400 - P-51 MustangBuild13-Mar-22 19:42
Views : 2032
Started building this in late 2020, and lots of other stuff in between. I was able to complete the covering this weekend. Sneak preview, more work to go. Many cool color schemes for the P51, but it was an easy decision to honor the colors of the Tuskegee Airmen.
TJHGuillows Series 400 - P-51 MustangBuild13-Mar-22 19:41
Views : 1958
TJHGuillows Series 400 - P-51 MustangBuild13-Mar-22 19:40
Views : 1820
TJHGuillows Series 400 - P-51 MustangBuild13-Mar-22 19:40
Views : 2015
edtherendermanCleveland Westland WhirlwindBuild13-Mar-22 18:29
Views : 436
Fully retracted from the top.
Hangar Aircraft Category Date Preview
edtherendermanCleveland Westland WhirlwindBuild13-Mar-22 18:29
Views : 486
Fully retracted
edtherendermanCleveland Westland WhirlwindBuild13-Mar-22 18:28
Views : 403
Gear partially retracted.
edtherendermanCleveland Westland WhirlwindBuild13-Mar-22 18:28
Views : 383
Gear fully down from the top as if looking into the engine nacelle.
edtherendermanCleveland Westland WhirlwindBuild13-Mar-22 18:27
Views : 373
The landing gear is another engineering challenge. I was able to find an original drawing of the landing gear configuration, which was really helpful. I didn’t understand how the supporting struts worked until I found it. So I spend several evening trying to create the struts using brass and copper tubing, but realized I could 3D print them with enough detail and strength to work. I had already cut the gear doors out of one of the nacelles and was able to use that as a rig. After getting everything working, I created a test rig out of bamboo skewers for to build the other side. Here is the gear in fully down position.
mark eggebeenGuillows Series 2000 - B17 Flying FortressBuild11-Mar-22 11:14
Views : 756
I have read the instuctions on the card..I have coated the card stock and have a piece of clear . .Now. I need some step by step to get me through the rest of this and ready to glue up.
David DuckettTodays Hobbies F4-E Phantom IIBuild10-Mar-22 03:38
Views : 3784
Page (3327 in total) :  <<   76   77   78   79   80  [ 81 ]  82   83   84   85   86   >>  [ < Prev ] [ Next > ]