I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (133 in total) :  1   2   3  [ 4 ]  5   6   7   8   9   10   11   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
SteveMGuillows Series 2000 - P-38 LightningBuild02-Dec-13 22:58
Views : 717
I was unable to confirm this detail on existing build logs here at the VA. If you are going to build the rudder-fins per the "action plan" then you have to put a 1/16" square piece across the end of the fuselage like this. When I glue the keel down it will be to the top of the 1/16" square piece.
SteveMGuillows Series 2000 - P-38 LightningBuild02-Dec-13 22:55
Views : 619
One half of one of the fuselages is nearly done. This is no small model!
Hangar Aircraft Category Date Preview
SteveMGuillows Series 2000 - P-38 LightningBuild02-Dec-13 22:54
Views : 621
I'm stopping the nacelle at this point for now. This way I prioritize building with sheet wood and leave myself lots of room to work on the LG.
SteveMGuillows Series 2000 - P-38 LightningBuild01-Dec-13 14:06
Views : 593
The results of a quiet evening out watching TV with the boss. The wood char from the laser is sanded off of the edges.
Page (133 in total) :  1   2   3  [ 4 ]  5   6   7   8   9   10   11   >>  [ < Prev ] [ Next > ]